Projects

Seif Palace (Council of Ministers) Extension of Buildings

Design Development, Construction, Completion & Maintenance for Seif Palace (Council of Ministers) Extension of Buildings, Kuwait. 

Read more...

Al-Babtain Tower


Project comprises of a multi-use complex on a plot area of 5,000 m2 to include a car park for 150 vehicles at basement levels, 6,620 m2 of multi-use commercial areas

Read more...

Central Bank of Kuwait

Construction, completion, commissioning, handover and maintenance of a "state of art iconic" 40-storey office tower with 4-storey podium, car parking for staff and visitors..

Read more...

New Jahra Hospital


All concrete, blockwork and steel structural works..

Read more...

KAPF Car Park & Shops Project


The project includes the design, construction, completion and maintenance of a 7 level Car Park and Shopping facility with 2 Basement Car Parks, Ground & Mezzanine Floor shop areas

Read more...

Intl. Hospital Complex


All concrete, blockwork and steel structural works..

Read more...

Kuwait International Airport

 

Design, construction, completion and maintenance of Administration Building (71,921 M2), Car park (79,182 M2), and Fire Station (9,710 M2)..

Read more...

Jaber Al Ahmed City


Soil Improvement of weak soil, construction and maintenance of roads and 1,472 Houses + 70 units of Vertical Houses)...

Read more...

Eshbeeliyah Neighbourhood Center

Construction and completion of Buildings (area of approx. 39,656 m2),  Police Station (6,660 m2), Super market (30,510 m2), Post Office(1,298 m2), Library (3,553 m2)and Gas station (210 m2).

Read more...

Sabah Al Ahmed City Housing


Construction of 1271 new houses in Areas # A1, A2 and A3 at the Sabah Al-Ahmed City on a total built-up area of 595,575 M2 in two (2 ) Phases.  Phase 1 include completion of a 905 No. Houses, public buildings..

Read more...

Wafra Mall Project-Bp2

Construction, completion and defect liability cover of Wafra Mall, a 24 floors commercial building consists of 2 Basements for Carparks, Ground Floor and 2 Mezanine floors..

Read more...

Jahra Court Complex

 

 Default Image

Construction, Completion, Furnishing, Operation and Maintenance of Al Jahra Court Complex..

Read more...

Ministry of Education Headquarters

Construction, completion, furnishing and maintenance of a Headquarters Building at South Surra on total site area: 40,000 M2 with built-up area: 264,930 M2. The building comprises of three basements (102,930 M2). 

Read more...

Sabah Al Salem Sewerage


Project comprises of: 1) Remove old sewege pipe line and laying new pipe line and manholes for sewage network to approximately 112 km by open cut methods and 8km by microtunnelling.

Read more...

Administration Building at Gulf Cable Company


Construction, Completion and Maintenance of Gulf Cable Company Office Building..

More Details

Sanitary Sewer Improvement, Bayan


Project's scope include:  Remove old sewege pipeline, laying new pipeline and manholes for sewage network to approximately 62 km by open cut methods and 8km by microtunnelling...

Read more...

Al-Aqeelah Tower


Construction, completion and maintenance of a residential building consisting of double basements, ground floor, 15 floors & roofs...

Read more...

A7 Pump Station


A7 Pump station and its associated tunnels..

Read more...

Al-Shirraa Tower


Construction of a 30 floors office building to include site works (excavation, shoring & dewatering), sub structure cast in-situ concrete works (raft foundations, perimeter walls)..

Read more...

Maintenance of Highways & Roads


Maintenance of Roads, Infrastructure and related works for several highways and roads around Kuwait..

Read more...

Page 1 of 2